Challenge

Microplásticos struggled with inefficiencies in the assembly line due to a paper-based instruction system. This led to unclear operator guidelines, some setup errors, and extended training times for new workers, causing production delays and increased downtime. The absence of real-time monitoring further complicated problem-solving, highlighting the need for a more efficient, connected, and streamlined solution.

Results

40%
reduction in training times
32%
fewer setup errors
2x
faster problem identification
15%
less operational downtime

About Microplásticos

Founded in 1987

150M parts per year produced

500 workers across Portugal and Poland

Solution

The solution focused in three key improvements: Digitalisation of operational processes and work instructions, digitalization of onboarding and training materials, and the implementation of a back office platform to help monitor processes and teams.

Watch Testimonial

Before Glartek

Inefficient paper-based instructions, lack of real-time monitoring, and long learning curves.

Before implementing Glartek’s solution, Microplásticos faced several operational challenges.  Their reliance on paper-based instructions led to unclear guidelines for operators, which increased the setup errors and slowed down production.

This system also resulted in longer learning curves for new workers. Additionally, without real-time monitoring, problem-solving was delayed, emphasising the need for a digital solution to streamline processes and speed up worker integration.

After Glartek

Digital work instruction and real-time monitoring for streamlined operations

Glartek’s solution digitized Microplásticos’ procedures, helping improve operational efficiency. A mobile application allowed workers to quickly access clear, step-by-step work instructions, significantly decreasing setup errors by 32% and reducing the training times of new workers by 40%.

Additionally, real-time monitoring enabled 2x faster identification and resolution of issues. This improved response times, reduced downtime in 15% and increased overall productivity, making their operations more efficient and streamlined.

Request a Demo
"We have been able to reduce downtime and increase our productivity by mitigating errors, especially in set-up. At the same time, initial launches have 
also become more controlled and stable.”

João Marques, Administrator at Microplásticos

Download the full PDF case study today!

No items found.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Related Resources

Subscreva agora para receber as nossas últimas informações e atualizações 🚀

Descubra o poder do único EHSQ nativo da IA construído especificamente para a linha de frente

Obrigado! A sua submissão foi recebida!
Opa! Algo correu mal ao submeter o formulário.
Obrigado! A sua submissão foi recebida!
Opa! Algo correu mal ao submeter o formulário.